Application Scenario Application Scenario | Source-side PV+storage plant - peak shaving Independent PV-BESS Power Plant Peak Shaving and Valley Filling |
Project Location Site Location | Bulgaria Bulgaria |
Installed Capacity Installed Capacity | PV: 10MWp BESS: 10MW-20MWh |
Plant Type Project category | Ground-mounted PV + container-type storage plant Ground Mounted PV and BESS Container Power Station |
Annual PV generation Annual Power Generation | 12,000,000KWh |
Daily storage cycles Daily Cycle Number of Energy Storage | 1 1 cycle/day |
Storage Operating Mode BESS Operation Mode | Grid-tied Grid Connected |
Emission Reduction Emission Reduction | 3880t/3880tons Bulgaria grid emission factor0.324 kgCO₂/kWh Average Grid Emission Factor of Bulgaria 0.324 kgCO₂/kWh |
Power-Sales Model Power Sales Mode | Full off-take by utility - storage-based peak shaving Full Purchase by the Grid Company-BESS supports Peak Shaving and Valley Filling |