Greek Cement Plant PV+Storage Project

Published on:2026-05-08

|

Posted by:SunLink

1.jpg

Application Scenario

Application Scenario

Load-side PV+storage plant - reduces gas-generator use, improves grid stability

Reduce the operation of gas generators and improve the stability of the power supply system

Project Location

Site Location

Greece

Greece

Installed Capacity

Installed Capacity

PV: 10MWp 

BESS: 5MW-10MWh

Plant Type

Project category

rooftopPV +Ground-mounted PV + container-type storage plant

Rooftop and Ground Mounted PV and BESS Container Power Station

Annual PV generation

Annual Power Generation

13,000,000 kWh 

Daily storage cycles

Daily Cycle Number of Energy Storage

1

1 cycle/day

Storage Operating Mode

BESS Operation Mode

Off-grid

Off-grid system

Emission Reduction

Emission Reduction

3835t/3835tons

Greece per EU grid emission standard0.295 kgCO₂/kWh 

According to EU standard factor

0.295 kgCO₂/kWh

Power-Sales Model

Power Sales Mode

Self-consumption, reduces gas-generator use; storage improves grid stability

Self-consumption, Reduce the operation of gas generators and improve the stability of the power supply system by BESS