Application Scenario | Load-side PV+storage plant - peak load shaving User-side PV-BESS Power Station Peak load smoothing & basic electricity cost reduction |
Project Location Site Location | Republic of Palau Republic of Palau |
Installed Capacity Installed Capacity | PV: 2MWp BESS: 2.5MW-5MWh |
Plant Type Project category | rooftopPV + C&I storage plant Rooftop PV and C&I BESS Cabinet Power Station |
Annual PV generation Annual Power Generation | 2,800,000KWh |
Daily storage cycles Daily Cycle Number of Energy Storage | 1 1 cycle/day |
Storage Operating Mode BESS Operation Mode | Grid-tied Grid Connected |
Emission Reduction Emission Reduction | 1492t/1492 tons Palau followsJapan JCM mechanism: 0.533 kgCO₂/kWh According to Japan JCM mechanism 0.533 kgCO₂/kWh |
Power-Sales Model Power Sales Mode | Self-consumption, Surplus to grid - peak load shaving Self-consumption with surplus grid feed-in, Peak load smoothing & basic electricity cost reduction |