Palau Supermarket PV-Storage Project

Published on:2026-05-08

|

Posted by:SunLink

2.jpg


Application Scenario

Application Scenario

Load-side PV+storage plant - peak load shaving

User-side PV-BESS Power Station

Peak load smoothing & basic electricity cost reduction

Project Location

Site Location

Republic of Palau

Republic of Palau

Installed Capacity

Installed Capacity

PV: 2MWp 

BESS: 2.5MW-5MWh

Plant Type

Project category

rooftopPV + C&I storage plant

Rooftop PV and C&I BESS Cabinet Power Station

Annual PV generation

Annual Power Generation

2,800,000KWh

Daily storage cycles

Daily Cycle Number of Energy Storage

1

1 cycle/day

Storage Operating Mode

BESS Operation Mode

Grid-tied

Grid Connected

Emission Reduction

Emission Reduction

1492t/1492 tons

Palau followsJapan JCM mechanism: 0.533 kgCO/kWh

According to Japan JCM mechanism

0.533 kgCO/kWh

Power-Sales Model

Power Sales Mode

Self-consumption, Surplus to grid - peak load shaving

Self-consumption with surplus grid feed-in, Peak load smoothing & basic electricity cost reduction